Completed Projects

Projects / Completed Projects
MBC

Completed Projects




Private Road
Client :Private
Consultants: Private
MBC Role: Main Contractor
Duration: 6 Months
Location : Abu Dhabi, UAE

Sub-Grade and Sub-base works in addition to asphalt pavement, road marking and curbstone installation


Minor Roads and Parking in Al Ain Stage – 12
Client :Al Ain Municipality
Consultants: TESCO
MBC Role: Main Contractor
Duration: 21 Months
Location : Al Ain, UAE

EPC contract for Sewerage, Storm water, Earthling,asphalt paving, Interlocking tiles and curbstone installation. The project also entailed soft/hard landscaping working and street lighting.


Minor Roads and Parkings in Al Ain Stage 9 & 11 Contract 1
Client :Al Ain Municipality
Consultants: Al Torath International
MBC Role: Main Contractor
Duration: 12 Months
Location : Al Ain, UAE

EPC contract for Sewerage, Storm water, Earthling, asphalt paving, Interlocking tiles and curbstone installation. The project also entailed soft/hardm landscaping working and street lighting.


Bawabat Al Sharq – Phase 3 Infrastructure works
Client :BIDC
Consultants: AECOM
MBC Role: Main Contractor
Duration: 18 Months
Location : Abu Dhabi, UAE

EPC contract for Sewerage, Storm water, Earthling, asphalt paving, Interlocking tiles and curbstone installation within a housing compound composed of 156 residential villas. The project also entailed soft/hard landscaping working and street lighting.


Al Ain Fayda Emirati Housing Programme Phase 1
Client :Musanada
Consultants: Al Salam Consulting
MBC Role: Main Contractor
Duration: 12 Months
Location : Al Ain, UAE

EPC contract for Sewerage, Storm water, Earthling,asphalt paving, Interlocking tiles and curbstone installation. The project also entailed soft/hard landscaping working and street lighting.


Mezyad & Umghafa Villas
Client :Musanada
Consultants: Nael General Contracting
MBC Role: Main Contractor
Duration: 9 Months
Location : Al Ain, UAE

EPC contract for Sewerage, Storm water, Earthling, asphalt paving,Interlocking tiles and curbstone installation. The project also entailed soft/hard landscaping working and street lighting.


National Dairy Plant Project
Client :National Dairy LLC
Consultants: Mark Habre & Associates Architectural & Engineering Consultant
MBC Role: Main Contractor
Duration: 3 Months
Location : Al Ain, UAE

Construction and Road Works


Hatchery Project
Client :Al Ain Farms for Animal Production
Consultants: Al Qanater Al Thahbia Gen. Cont
MBC Role: Main Contractor
Duration: 3 Months
Location : Al Ain, UAE

External works entailing, substructure,earthworks and asphalt for entrance road


Soft Landscaping, Furniture’s & Irrigation Lateral Lines
Client :BIDC
Consultants: BIDC
MBC Role: Main Contractor
Duration: 21 Months
Location : Abu Dhabi, UAE

Soft Landscaping works, irrigation lines and channels in addition to complete furnishing of the facility.


Minor Roads and Parking in Al Ain – Stage 8 Contract 1 and 2
Client :Al Ain Municipality
Consultants: Conseco
MBC Role: Main Contractor
Duration: 19 Months
Location : Al Ain, UAE

Construction of roads and parking areas within the city of Al Ain. With over 30 independent locations, this project required efficient logistical planning.


Shopping Centre Abu Dhabi Cooperative zone – Car park
Client :Polensky & Zoellner
Consultants: Heberger Eng.
MBC Role: Main Contractor
Duration: 12 Months
Location : Abu Dhabi, UAE

60,000m2 of sub-grade, sub-base and asphalting. Works included storm water drainage system in addition to interlocking tiles, curbstone and road marking for entire area.


Minor Roads and Parking in Al Ain – Stage 5, Contract 1
Client :Al Ain Municipality
Consultants: Tesco
MBC Role: Main Contractor
Duration: 16 Months
Location : Abu Dhabi, UAE

The project comprises the construction of the roads and parking’s in Al Ain; works entailed:

1.Earthworks 2.Asphalting 3.Electrical Lighting 4.Footpath and curbstone installation


Roads and Parking for Mosques, Schools and Public Buildings in Al Ain
Client :Al Ain Municipality
Consultants: Tesco.
MBC Role: Main Contractor
Duration: 36 Months
Location : Al Ain, UAE

Construction of roads and parking areas within the city of Al Ain. With over 30 independent locations, this project required efficient logistical planning. Master Builders was awarded a variation of over 80% of the original project value due to the satisfaction of our clients.


Private Facility
Client: CMW.
Main Contractor: Nael General Contracting LLC
MBC Role: Infrastructure Contractor
Duration: 15 Months
Location : Liwa, UAE

320,000 M2 of earthing material and asphalt paving. Scope includes subgrade, base course and asphalt paving.


Contract for the tarmac works at Sorbonne University
Client: Sorbonne University
Consultants: Achy-tecture Construction LLC
MBC Role: Main Contractor
Duration: 3 Months
Location : Abu Dhabi, UAE

Asphalt paving, Road making and curbstone maintenance for entire university campus.


Bawabat Al Sharq Infrastructure – Phase 5 - 36 Villas
Client: RIC.
Consultants: Mimar Abu Dhabi Engineering Consultants
MBC Role: Main Contractor
Duration: 15 Months
Location : Liwa, UAE

Sewerage, Storm water and electrical substructure network in addition to earthling layer and asphalt paving. Hard and soft landscaping in addition to street lighting.